Bonaventure Master Plan
The Bonaventure Master Plan project is comprised of Phases I, II, III and IV. These infrastructure improvements are funded by the Bonaventure Development District.
Phase V
Location: Bonaventure area of Weston
Description: Traffic calming (pavers) at Lakeview Dr. & Saddle Club and Bonaventure Blvd. & Saddle Club. Entry features at Weston Rd. & Blatt Blvd. and S.R. 84 & Bonaventure Blvd. Racquet Club Rd. drainage improvements, from Gable Blvd. to Riviera Circle. Miscellaneous drainage improvements to various areas of Bonaventure. Swale improvements to Blatt Blvd., Saddle Club Rd. and Lakeview Dr. Hedges along all main public rights-of-way (requires easements).
Phase:
Design Bid Construction
Completion: Substantially complete
 
BDD Pump Stations
Location: On the south side of St. Rd. 84 with discharge pipes under I-75 to the North New River Canal
Description: Two new pump stations will replace two 30-year old stormwater pump stations that transfer water from the city's closed canal system to the SFWMD's North New River Canal . They provide flood control for the residents and businesses located in the Bonaventure basin area. The pumps will be housed in new buildings to protect the engines, generator and ancillary equipment. The City has received two grants so far to assist in funding this multi-million dollar project.
Phase:
Design Bid Construction
Completion: November 2009